FirstRig
firstrig.com

Observatory build Reference

Cut list

Every cut piece with length and count, for framing and pier.

3 min read

Read this

This is one person’s build, not engineering guidance. Local codes, soils and loads vary.

On this page

All lengths in inches. Counted off the 3D model.

Framing

Cut list: framing
MemberSizeLengthQtyCut fromNotes
Joists2x8 PT117″92x8 x 10'Face-mount hangers, tops flush at +10.75"
Skirtboard, two sides2x8 PT120″22x8 x 10'As built 2x8; the plan was 2x10
Skirtboard, other two2x8 PT117″22x8 x 10'As built 2x8; the plan was 2x10
Posts4x4 PT~1184x4 x 8'CUT INDIVIDUALLY after all blocks are leveled
Pier blocking2x8 PT14.5″22x8 x 8'Bay Y 44-60, centered X 44 and X 60
Ring blocking2x8 PT14.5″102x8 x 8'Where the 88" circle crosses each joist bay, NOT on grid lines
Bay blocking2x8 PT14.5″22x8 x 8'X 34 and X 70, bay Y 92-108
Bay blocking, short2x8 PT8.25″22x8 offcutX 34 and X 70, bay Y 108-117.75
Decking5/4 x 6 PT120″215/4 x 6 x 10'Middle board ripped to 4-5/8" to fit around the pier. Crown up, cup hollow-side DOWN; gaps set with a square as the gauge
Front edge wrap5/4 x 6 PTnot recorded1deckingWraps the front face; there is no separate fascia
Hatch boards5/4 x 6 PT17.5″5decking offcutCut from the field after decking over the opening

Pier

Cut list: pier
MemberSizeLengthQtyCut fromNotes
Rebar verticals#4 (1/2")70″4#4 x 10'3" clear at bottom, ~4" below pour line at top. 50" offcut each.
Rebar ties#3 (3/8")5″12#3 bar, 60" total (one 4' bar is 12" short)4 per level, 3 levels, below grade only. Straight; no bending.
Footing cross ties#4 offcut11″2vertical offcutFlat in the footing, 3" up. Optional.
Form tube12" diato the height mark112" x 48" tubeCUT IN PLACE off a level line from the joist tops. Rim = screed line.
Threaded rods1/2"-1336″4stock 36"~31" embedded, ~5" projecting, 27" lap with the cage
Tube spacers2" OD x .25 wall= chosen gap4steel tubeEnds faced square. Test the gap with a wrench in hand BEFORE cutting.

Before you cut

  • Test the adapter gap on the bench with a hand and wrench before cutting spacers. The gap is the free variable, and the pour height follows from it.
  • Measure the assembled adapter height, then: concrete_top_above_floor = 34.5 - adapter_height.
  • Cut the form in place off a level line from the joist tops, not to a computed length from grade, because grade is not flat.

Two cuts to get right

Posts. Never pre-cut all eight. If one block sits 1/8" low, that post gets 1/8" more, and the skirtboard still lands at 10-3/4" everywhere.

Ring blocking. The ten positions are where the 88" circle crosses each joist bay, not a convenient grid. The dome's load arrives as a line around that circle, so blocking anywhere else carries none of it.

Last updated