On this page

Quantities are what to buy. Where the installed count differs, both are shown.

Foundation

QtyItemSpecNotes
8 eachCAMO Block deck block15.75" x 15.75" x 3.5" polyolefin, 1800 lb ratedAccepts a 4x4 post directly. Six passes but sits at 85% of rating — eight halves it.Source: https://www.homedepot.com/p/CAMO-2-2-lb-Deck-Block-for-Joist-and-Post-Foundation-0420001/319396055
0.5 cu yd3/4-minus crushed gravel4" compacted under each blockNot sand. Not pea gravel. Tamp in two lifts.

Framing lumber

QtyItemSpecNotes
1 8' stick4x4 PTground contact UC4AYields all 8 short posts. Cut individually AFTER blocks are leveled.
4 10' stick2x10 PTground contact UC4ASkirtboard, all four sides
11 10' stick2x8 PT—9 joists at 117" + 2 spare
4 8' stick2x8 PT—Pier blocking, ring blocking, bay blocking
24 10' board (installs 21)5/4 x 6 PT deckingactual 1" x 5.5"Rated for 16" o.c. Extra covers hatch sub-frame and culls.
4 10' board1x or 5/4 fascia—Skirt. Stop 2" above grade for ventilation.

Deck hardware

QtyItemSpecNotes
20 each2x8 face-mount joist hangerhot-dip galvanized or stainless9 joists x 2 ends + spares. No ledger — fastens to the 2x10 rim.
1 1 lb boxJoist hanger nails 1-1/2"HDGHangers need hanger nails, not deck screws
16 set3/8" x 6" carriage bolt + washer + nutHDG or stainless2 per post into the skirtboard
500 screwGRK Deck Elite #9 x 2-1/2"type-17 point, bugle head, Climatek coatingThe type-17 point is what prevents splitting — not the gauge. No pre-drilling needed in 5/4.
1 canEnd-cut preservative—Every PT cut

Pier — concrete and form

QtyItemSpecNotes
12 bag60 lb high-strength concrete mix—~5.4 cu ft for a 12" form to this height
1 eachConcrete form tube12" diameter x 48"Cut to length IN PLACE so the rim is the screed line. Set from grade up — it is a form, not structure.
4 10' bar#4 rebar1/2"Cut to 70" for verticals. 50" offcuts become footing cross ties.
1 4' bar#3 rebar3/8"Twelve 5" tie pieces need 60" of bar plus kerf, 12" more than one 4' bar holds. No bending required.
1 rollTie wire—Ties, and hanging the cage from the rim stick
4 eachDobie blocks3"Or place a 4" base lift and set the cage into it. Never wood, brick or rock.

Pier adapter

QtyItemSpecNotes
2 eachBrake rotor, solid2012 Chevy Malibu — center bore fits the EQ6-RDegrease thoroughly. Leave embedded faces bare.
4 each1/2"-13 x 36" all-thread304 stainlessCan never be replaced without destroying the pier. Hot-dip galvanized is equally correct.
20 each1/2" hex nutmatch rod material5 per rod
8 each1/2" fender washermatch rod material2 per rod — top (spans 5/8" holes) and buried anchor
16 each1/2" flat washermatch rod material1 per rod used, rest spare
1 bottleNickel anti-seizenickel-based, NOT PTFE or food-gradeStainless galls. Exposed threads only — never on anything concrete touches.
4 eachSteel tube spacer2" OD x 0.25" wall, cut to the chosen gapEnds must be faced square and flat
1 assortmentStainless shim stock—Leveling under the spacers
1 each5/8" drill bit for cast iron—Top rotor only. Drill dry, 300-400 rpm, clamp the work.

Conduit and trench

QtyItemSpecNotes
measure (10' stick)1" PVC sch 40 conduit (gray electrical)gray electrical, NOT white plumbingTwo runs. Quantity = run length + 20%, rounded to whole sticks, x2. Measure your distance to the house.
6 each1" PVC sweep 90long sweepNEVER hard elbows — you will not pull Cat6 through one
1 setPVC conduit cement + couplings—
2 rollPull string / mule tape—Run before backfilling. Non-negotiable.
4 eachConduit caps—Concrete inside a conduit ends that conduit permanently

Isolation

QtyItemSpecNotes
1 eachFlexible pier collar / boot / loose trim ring⚑ Critical to isolation—Closes the 1-1/4" gap. Fastened to the DECK side only. Never caulk solid.

Wind anchoring

QtyItemSpecNotes
4 eachEarth/auger anchor + cable or strap⚠ Unresolved — ask the manufacturer—UNRESOLVED — this is a floor, not a manufacturer spec. Ask NexDome about anchoring on a non-monolithic base.

Tools

ToolWhy
Rotary laser level or long straightedge + levelEight blocks to a single plane
Post-hole digger or rented 12" auger36" pier hole
Trenching shovel18" conduit trench
Wheelbarrow or mixing tub + hoe12 bags of concrete
25' steel tape, chalk line, speed squareDiagonals must read 169-11/16"
4' levelForm plumb in two directions
Torpedo levelRotor at 0/45/90/135 degrees
Circular saw—
Impact driver + socket setCarriage bolts
Rebar cutter or angle grinderCutting bars to length
Hand tamperGravel pads in two lifts
Respirator + eye protectionCast iron dust is fine and dark; wet concrete is caustic

Four choices worth explaining

Ground-contact PT (UC4A), not above-ground (UC3B) for posts, skirtboard, and anything within 6" of soil. Small price difference, and it is the wet-climate failure mode.

Hot-dip galvanized or stainless fasteners only. Modern PT chemistry destroys electroplated fasteners — hangers, bolts, screws and nails alike.

304 stainless rods over cheaper options. Not for strength; the static load is under 100 lb and any rod is overbuilt. These four rods can never be replaced without destroying the pier, and the 6-1/4" bolt square leaves only 1.33" of cover. Hot-dip galvanized would be equally correct — electroplated zinc would not.

GRK Deck Elite screws after three wrong answers. What prevents splitting in 5/4 decking is a type-17 auger point, not the gauge. A #10 stainless splits without pre-drilling, a #7 stainless snaps heads in dense PT, and a trim head pulls straight through decking.