Yields all 8 short posts. Cut individually AFTER blocks are leveled.
4 10' stick
2x8 PT
ground contact UC4A
Skirtboard, all four sides. As built 2x8; the plan was 2x10.
11 10' stick
2x8 PT
9 joists at 117" + 2 spare
4 8' stick
2x8 PT
Pier blocking, ring blocking, bay blocking
24 10' board (installs 21)
5/4 x 6 PT decking
actual 1" x 5.5"
Rated for 16" o.c. The middle board is ripped to 4-5/8" around the pier; one more wraps the front face (I built no separate fascia). Extra covers hatch sub-frame and culls.
Deck hardware
Parts: deck-hardware
Qty
Item
Spec
Notes
20 each
2x8 face-mount joist hanger
hot-dip galvanized or stainless
9 joists x 2 ends + spares. No ledger; fastens to the 2x8 rim.
1 1 lb box
Joist hanger nails 1-1/2"
HDG
Hangers need hanger nails, not deck screws
16 set
3/8" x 6" carriage bolt + washer + nut
HDG or stainless
2 per post into the skirtboard
500 screw
GRK Deck Elite #9 x 2-1/2"
type-17 point, bugle head, Climatek coating
The type-17 point prevents splitting. No pre-drilling needed in 5/4.
1 can
End-cut preservative
Every PT cut
Pier: concrete and form
Parts: pier-concrete
Qty
Item
Spec
Notes
12 bag
60 lb high-strength concrete mix
~5.4 cu ft for a 12" form to this height
1 each
Concrete form tube
12" diameter x 48"
Cut to length IN PLACE so the rim is the screed line. Set from grade up; the tube is a form only.
4 10' bar
#4 rebar
1/2"
Cut to 70" for verticals. 50" offcuts become footing cross ties.
1 4' bar
#3 rebar
3/8"
Twelve 5" tie pieces need 60" of bar plus kerf, 12" more than one 4' bar holds. No bending required.
1 roll
Tie wire
Ties, and hanging the cage from the rim stick
4 each
Dobie blocks
3"
Or place a 4" base lift and set the cage into it. Never wood, brick or rock.
Pier adapter
Parts: pier-adapter
Qty
Item
Spec
Notes
2 each
Brake rotor, solid
2012 Chevy Malibu; center bore fits the EQ6-R
Degrease thoroughly. Leave embedded faces bare.
4 each
1/2"-13 x 36" all-thread
304 stainless
Can never be replaced without destroying the pier. Hot-dip galvanized is equally correct.
20 each
1/2" hex nut
match rod material
5 per rod
8 each
1/2" fender washer
match rod material
2 per rod: top (spans 5/8" holes) and buried anchor
16 each
1/2" flat washer
match rod material
1 per rod used, rest spare
1 bottle
Nickel anti-seize
nickel-based, NOT PTFE or food-grade
Stainless galls. Exposed threads only; never on anything concrete touches.
4 each
Steel tube spacer
2" OD x 0.25" wall, cut to the chosen gap
Ends must be faced square and flat
1 assortment
Stainless shim stock
Leveling under the spacers
1 each
5/8" drill bit for cast iron
Top rotor only. Drill dry, 300-400 rpm, clamp the work.
Conduit and trench
Parts: conduit
Qty
Item
Spec
Notes
measure (10' stick)
1" PVC sch 40 conduit (gray electrical)
gray electrical, NOT white plumbing
Two runs. Quantity = run length + 20%, rounded to whole sticks, x2. Measure your distance to the house. As built: white PVC plumbing pipe, carrying only Ethernet and 12 V DC leads. That is fine as a sleeve for low-voltage cable; for mains use listed electrical conduit (UL 651) per local code. Plumbing PVC is not rated for sunlight above ground.
6 each
1" PVC sweep 90
long sweep
NEVER hard elbows; you will not pull Cat6 through one
1 set
PVC conduit cement + couplings
2 roll
Pull string / mule tape
Run before backfilling. Non-negotiable.
4 each
Conduit caps
Concrete inside a conduit ends that conduit permanently
Isolation
Parts: isolation
Qty
Item
Spec
Notes
1 each
Flexible pier collar / boot / loose trim ringCritical to isolation
Closes the 1-1/4" gap. Fastened to the DECK side only. Never caulk solid.
Wind anchoring
Parts: wind
Qty
Item
Spec
Notes
4 each
Earth/auger anchor + cable or strapUnresolved: ask the manufacturer
UNRESOLVED: four is a floor with no manufacturer spec behind it. Ask NexDome about anchoring on a non-monolithic base.
Tools
Tools
Tool
Why
Rotary laser level or long straightedge + level
Eight blocks to a single plane
Post-hole digger or rented 12" auger
36" pier hole
Trenching shovel
18" conduit trench
Wheelbarrow or mixing tub + hoe
12 bags of concrete
25' steel tape, chalk line, speed square
Diagonals must read 169-11/16"
4' level
Form plumb in two directions
Torpedo level
Rotor at 0/45/90/135 degrees
Circular saw
Impact driver + socket set
Carriage bolts
Rebar cutter or angle grinder
Cutting bars to length
Hand tamper
Gravel pads in two lifts
Respirator + eye protection
Cast iron dust is fine and dark; wet concrete is caustic
Four contested choices
I used ground-contact PT (UC4A) rather than above-ground (UC3B) for posts,
skirtboard, and anything within 6" of soil. The price difference is small, and
soil contact is the wet-climate failure mode.
Every fastener is hot-dip galvanized or stainless. Modern PT chemistry destroys
electroplated fasteners: hangers, bolts, screws and nails alike.
I chose 304 stainless rods over cheaper options. Strength did not drive it; the
static load is under 100 lb and any rod is overbuilt. These four rods can never be
replaced without destroying the pier, and the 6-1/4" bolt square leaves only 1.33"
of cover. Hot-dip galvanized would be equally correct; electroplated zinc would
not.
I settled on GRK Deck Elite screws after three wrong answers. A type-17 auger
point prevents splitting in 5/4 decking, where gauge does not. A #10 stainless
splits without pre-drilling, a #7 stainless snaps heads in dense PT, and a trim
head pulls straight through decking.