I used 5/4 × 6 pressure treated: nominal 1¼ × 6, actual 1″ × 5½″. Rated for 16″ o.c., which matches the joist spacing with no need for extra blocking.
3D modelSee the deck in plan, from above in the 3D model, generated from the build spec, as designed or as built.
The count
At 5½″ plus a ⅛″ gap, each board occupies 5⅝″. 120″ ÷ 5.625 = 21.3 boards.
Three ways to absorb the remainder:
| Approach | Boards | Result |
|---|---|---|
| Widen the gaps | 21 full | Gaps go to ~7/32″. No ripping |
| Rip the last one | 21 + 1 rip | One 2″ sliver at an edge |
| Rip both edges | 20 + 2 rips | Two ~3¾″ boards, symmetric |
Ripping both edges reads as intentional where a single sliver reads as a mistake.
As built, I used none of the three: 21 boards, with the middle board ripped to 4⅝″ so the decking fits around the pier. I set the gaps with a square used as a spacing gauge rather than measuring them. Buy 24 to cover the hatch sub-frame, culls and the front edge (below).

Crown and cup
Crown is the curve along the board's length. Sight down the edge like a rifle barrel; one edge reads as a shallow arch. Lay it arch-up so the screws pull it flat. Arch-down and the ends lift.
For decking this is the minor issue. Crown-up is a firm rule for joists, where load flattens the arch over a long span. Over 16″ the screws win regardless.
Cup is the curve across the width, visible in the end grain, and it matters more. A board laid hollow-side-up becomes a shallow trough holding standing water on every board, all winter. Look at the end of each board: if it is already cupped, lay it hollow-side down.
You may hear "bark side up" as a rule. It is contested. Judging the cup in front of you beats predicting which way it might move.
Screws
It took me four attempts to pick the screw.
| Considered | Problem |
|---|---|
| #10 × 2½″ stainless | Fat shank splits 5/4 at board ends without pre-drilling |
| #7 × 2¼″ stainless | Thin stainless shank snaps heads in dense PT |
| GRK trim-head #8 | Trim head pulls through decking; wrong head for this job |
| GRK Deck Elite #9 × 2½″ | Correct |
A type-17 (auger) point prevents splitting, where gauge does not: a cutout at the tip clears a channel instead of wedging fibers apart. Once you know to look for that, the choice is easy.
Deck Elite has the type-17 point, a proper deck head with enough bearing area, a #9 shank between the two failure modes, 2½″ giving a full 1½″ bite into the joist, and a Climatek coating rated for ACQ treated lumber.
About 500 screws: 9 joists × 2 screws × 21 boards is 378, plus hatch and blocking. Set the driver clutch and let the point do the work; swap the bit when it gets sloppy.
The hatch
Deck straight over the pier opening as if it were not there, then cut it out afterward. Cutting after gives continuous board lines across the opening instead of a patch that does not line up.
Build it as a panel on a small sub-frame that drops onto the blocking, screwed and never nailed, and keep those screws in their own pile so it unscrews cleanly later.
The deck edge
The plan was a fascia skirt: fascia first, then decking, with the decking's 1″ overhang covering the fascia's top edge, and the fascia stopped 2″ above grade.
As built, there is no separate fascia. I wrapped the front face with one more piece of decking, and the rim behind it is 2×8 rather than the planned 2×10 (see Framing). The other sides show the rim itself.
The reasoning behind the plan still applies to any skirt. Wood touching soil wicks moisture continuously and rots from the bottom regardless of PT rating.
And do not seal the perimeter completely. A skirt all the way around with no airflow turns the space under a deck this low into a moisture trap; that is how joist undersides rot even when everything is ground-contact rated. With only the front wrapped, my deck is open below the rim on the other sides.