Observatory build Chapter 8 of 10

Decking

Board count, crown and cup, the right screw after three wrong ones, and what the deck edge ended up as.

6 min read

Read this

This is one person’s build, not engineering guidance. Local codes, soils and loads vary.

On this page

I used 5/4 × 6 pressure treated: nominal 1¼ × 6, actual 1″ × 5½″. Rated for 16″ o.c., which matches the joist spacing with no need for extra blocking.

The count

At 5½″ plus a ⅛″ gap, each board occupies 5⅝″. 120″ ÷ 5.625 = 21.3 boards.

Three ways to absorb the remainder:

ApproachBoardsResult
Widen the gaps21 fullGaps go to ~7/32″. No ripping
Rip the last one21 + 1 ripOne 2″ sliver at an edge
Rip both edges20 + 2 ripsTwo ~3¾″ boards, symmetric

Ripping both edges reads as intentional where a single sliver reads as a mistake.

As built, I used none of the three: 21 boards, with the middle board ripped to 4⅝″ so the decking fits around the pier. I set the gaps with a square used as a spacing gauge rather than measuring them. Buy 24 to cover the hatch sub-frame, culls and the front edge (below).

Deck framing on black plastic blocks with two deck boards laid along the front edge and a concrete pier rising through the framing, under a pop-up canopy beside a wire fence.
The first decking going down along the front edge, with the pier standing in its opening behind and the deck blocks still visible under the rim.

Crown and cup

Crown is the curve along the board's length. Sight down the edge like a rifle barrel; one edge reads as a shallow arch. Lay it arch-up so the screws pull it flat. Arch-down and the ends lift.

For decking this is the minor issue. Crown-up is a firm rule for joists, where load flattens the arch over a long span. Over 16″ the screws win regardless.

Cup is the curve across the width, visible in the end grain, and it matters more. A board laid hollow-side-up becomes a shallow trough holding standing water on every board, all winter. Look at the end of each board: if it is already cupped, lay it hollow-side down.

You may hear "bark side up" as a rule. It is contested. Judging the cup in front of you beats predicting which way it might move.

Screws

It took me four attempts to pick the screw.

ConsideredProblem
#10 × 2½″ stainlessFat shank splits 5/4 at board ends without pre-drilling
#7 × 2¼″ stainlessThin stainless shank snaps heads in dense PT
GRK trim-head #8Trim head pulls through decking; wrong head for this job
GRK Deck Elite #9 × 2½″Correct

A type-17 (auger) point prevents splitting, where gauge does not: a cutout at the tip clears a channel instead of wedging fibers apart. Once you know to look for that, the choice is easy.

Deck Elite has the type-17 point, a proper deck head with enough bearing area, a #9 shank between the two failure modes, 2½″ giving a full 1½″ bite into the joist, and a Climatek coating rated for ACQ treated lumber.

About 500 screws: 9 joists × 2 screws × 21 boards is 378, plus hatch and blocking. Set the driver clutch and let the point do the work; swap the bit when it gets sloppy.

The hatch

Deck straight over the pier opening as if it were not there, then cut it out afterward. Cutting after gives continuous board lines across the opening instead of a patch that does not line up.

Build it as a panel on a small sub-frame that drops onto the blocking, screwed and never nailed, and keep those screws in their own pile so it unscrews cleanly later.

The deck edge

The plan was a fascia skirt: fascia first, then decking, with the decking's 1″ overhang covering the fascia's top edge, and the fascia stopped 2″ above grade.

As built, there is no separate fascia. I wrapped the front face with one more piece of decking, and the rim behind it is 2×8 rather than the planned 2×10 (see Framing). The other sides show the rim itself.

The reasoning behind the plan still applies to any skirt. Wood touching soil wicks moisture continuously and rots from the bottom regardless of PT rating.

Deck edge section as built Section through the front deck edge as built. A CAMO block carries a 4x4 post, which carries a 2x8 rim, the same depth as the 2x8 joists; the plan was a 2x10. There is no separate fascia skirt: the front face is wrapped with one decking board, whose exact position was not recorded. The decking runs over the top. The other sides show the rim, open below. Deck edge, as built grade 5/4 deckinggaps set with a square as the gauge Front wrap: one deck boardfront face only; no separate fascia 2x8 rim (planned 2x10)height above grade not recorded 2x8 joist CAMO block + 4x4 post Wrap position not recorded · other sides show the rim, open below

And do not seal the perimeter completely. A skirt all the way around with no airflow turns the space under a deck this low into a moisture trap; that is how joist undersides rot even when everything is ground-contact rated. With only the front wrapped, my deck is open below the rim on the other sides.

Last updated